The upper reservoir (Llyn Stwlan) and dam of the Ffestiniog Pumped Storage Scheme in north Wales. The four water turbines at the lower power station can generate 360 MW of electricity within 60 seconds of the need arising.
Taken by Adrian Pingstone in 1988 and released to the public domain.
Image links
There are no pages that link to this image.
All Wikipedia text
is available under the
terms of the GNU Free Documentation License